检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Keith Cameron Andrew Lewis Diogo Montalvao Mohammad Reza Herfatmanesh
机构地区:[1]School of Physics,Engineering and Computer Science,University of Hertfordshire,United Kingdom [2]Department of Design and Engineering,Faculty of Science and Technology,Bournemouth University,United Kingdom
出 处:《Petroleum》2023年第4期613-620,共8页油气(英文)
摘 要:Industrial process plants use emergency shutdown valves(ESDVs)as safety barriers to protect against hazardous events,bringing the plant to a safe state when potential danger is detected.These ESDVs are used extensively in offshore oil and gas processing plants and have been mandated in the design of such systems from national and international standards and legislation.This paper has used actual ESDV operating data from four mid/late life oil and gas production platforms in the North Sea to research operational relationships that are of interest to those responsible for the technical management and operation of ESDVs.The first of the two relationships is between the closure time(CT)of the ESDV and the time it remains in the open position,prior to the close command.It has been hypothesised that the CT of the ESDV is affected by the length of time that it has been open prior to being closed(Time since the last stroke).In addition to the general analysis of the data series,two sub-categories were created to further investigate this possible relationship for CT and these are“above mean”and“below mean”.The correlations(Pearson's based)resulting from this analysis are in the“weak”and“very weak”categories.The second relationship investigated was the effect of very frequent closures to assess if this improves the CT.ESDV operational records for six subjects were analysed to find closures that occurred within a 24 h period of each other.However,no discriminating trend was apparent where CT was impacted positively or negatively by the frequent closure group.It was concluded that the variance of ESDV closure time cannot be influenced by the technical management of the ESDV in terms of scheduling the operation of the ESDV.
关 键 词:Emergency SHUTDOWN VALVE Safety instrumented systems Closure time IEC-61511
分 类 号:TE58[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127