复杂条件下北外滩黄浦江防汛墙的设计对策  

Design Countermeasures for Flood Control Wall of Huangpu River in North Bund under Complicated Conditions

在线阅读下载全文

作  者:兰士刚 LAN Shigang

机构地区:[1]上海市堤防泵闸建设运行中心,上海市200050

出  处:《城市道桥与防洪》2024年第3期116-119,M0011,共5页Urban Roads Bridges & Flood Control

摘  要:北外滩滨江作为最后开发的岸线,建成后将成为北外滩世界级会客厅的重要窗口。为应对北外滩复杂的水文、地势地质及周边环境条件,结合实际经验,综合分析工程的水文地质、地形条件,采用水陆域统筹考虑的总体思路、创新的防汛墙设计对策、施工组织方案,实现了防汛墙的安全建设和按期完工,进而满足北外滩滨江的总体要求,达到了世界级滨水体验的要求。As the last development of the shoreline,the North Bund Riverside will become an important window of the world-class reception room of the North Bund after its completion.In response to the complex hydrological,geological,and surrounding environmental conditions of the North Bund,combined with the practical experience,the hydrogeological and topographic conditions of the project are analyzed comprehensively.By adopting the general idea of overall considering the water and land,and innovating the flood control wall design countermeasures and construction organization scheme,the safe construction of the flood control wall are realized and the project is completed on schedule,thus meeting the overall requirements of the North Bund Riverside and the requirements of a world-class waterfront experience.

关 键 词:复杂条件 北外滩 防汛墙 设计对策 

分 类 号:TV33[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象