检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈坚 CHEN Jian(Shanghai Mechanized Construction Group Co.,Ltd.,Shanghai 200072,China)
机构地区:[1]上海市机械施工集团有限公司,上海200072
出 处:《建筑施工》2024年第4期568-571,共4页Building Construction
基 金:上海建工集团股份有限公司科研项目课题(20JCSF-38)。
摘 要:为解决污水处理厂因受限于结构的特殊性,在预制装配式结构的应用方面进展缓慢的问题,结合某污水处理厂预制楼板结构施工,深入探讨该类型预制装配式结构的施工工艺。详细介绍了预制楼板施工中对结构、施工机械的优化情况,并对施工工艺进行了阐述,以期对类似工程的施工提供借鉴。To the issue of slow progress in the application of prefabricated assembly structures in sewage treatment plants due to the unique characteristics of their structures,combined with the construction of prefabricated floor slab structure in a sewage treatment plant,the construction process of this type of prefabricated assembly structure is discussed in depth.Furthermore,the optimization situation of structure and construction machines in the construction of precast floor slab is introduced in detail.Moreover,the construction technology is described and with the aim of providing reference for the implementation of similar engineering projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49