摘 要:针对隆德煤矿近距离煤层上下同采工作面巷道围岩稳定性控制问题,采用现场实测和理论分析方法,对多次采动影响下巷道支护体受力特征和煤柱应力演化特征进行研究。结果表明,巷道锚杆/索受力经历7个变化阶段,包括采动影响前初始稳定阶段、单工作面超前影响阶段、双工作面超前影响阶段、采动卸压区快速升高阶段、采动应力恢复区慢速升高阶段、二次稳定阶段和双工作面开采扰动升高阶段;煤柱采动应力演化经历5个阶段,包括采动影响前初始稳定阶段、单工作面超前影响区缓慢上升阶段、采动卸压区快速上升阶段、采空区压实自由演化阶段和双工作面开采扰动升高阶段。随着钻孔应力计安装深度增加,煤柱应力呈现先升高后降低趋势,煤柱浅部3 m左右进入塑性状态,承载能力降低;基于上述观测结果,对新掘巷道支护参数进行优化,在保证围岩长期稳定性的同时还可以降低支护费用,实测结果表明,支护参数优化后巷道表面位移量在工程允许范围内,巷道围岩裂隙发育程度较低。Aiming at the stability control of surrounding rock in the roadway of the upper and lower mining face of the coal seam in close proximity of Longde Coal Mine.The roadway support forcing characteristics and coal pillar’s stress evolving characteristics under the influence of multiple mining are studied using on-site observation and theoretical analysis.The results show that the bolt/cable force of roadway undergoes 7 stages:the initial stable stage before the influence of mining,the advanced influential stage of single working face,the advanced influential stage of double working faces,the rapid rising stage of mining pressure relief zone,the slow rising stage of mining stress recovery zone,the secondary stable stage and the rising stage of mining disturbance.The evolution of the mining stress of coal pillar experiences five stages:the initial stable stage before the influence of mining,the slow rising stage of the advanced influence area of working face,the fast rising stage of the mining pressure relief area,the free evolution stage of the mined-out area compaction and the rising stage of mining disturbance.With the increase of the installation depth of the borehole stress meter,the stress of the coal pillar increased at first and then decreased.The shallow part of the coal pillar entered a plastic state at about 3 m,and the bearing capacity was reduced.Based on the above observation results,the support parameters of newly tunneling roadway were optimized to ensure the long-term stability of surrounding rock and reduce the support cost.The measured results show that the roadway surface displacement was within the allowable range of the project,and the crack development degree of the surrounding rock was low.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38