检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高亮 马亮 刘忠平 李海瑞 刘荣 杨超 GAO Liang;MA Liang;LIU Zhongping;LI Hairui;LIU Rong;YANG Chao(Shaanxi Coal Group Shenmu Ningtiaota Mining Co.,Ltd.,Yulin 719300,China;Xi’an Green Mining Research Institute Co.,Ltd.,Xi’an 710054,China;Shaanxi Pioneering New Mineral Engineering Co.,Ltd.,Xi’an 710054,China;Shaanxi Pioneering Architectural Technology Co.,Ltd.,Xi’an 710054,China)
机构地区:[1]陕煤集团神木柠条塔矿业有限公司,陕西榆林719300 [2]西安绿色矿业研究院有限公司,陕西西安710054 [3]陕西开拓新矿业工程有限公司,陕西西安710054 [4]陕西开拓建筑科技有限公司,陕西西安710054
出 处:《陕西煤炭》2024年第5期55-60,共6页Shaanxi Coal
摘 要:针对日推采12~15 m工作面沿空留巷工艺要求,在结合理论计算和实际工况的基础上研发了长达19 m、控顶面积达38 m^(2)、挡矸面积达61 m^(2)的庞大组合体挡矸支架。针对该庞大支架的回撤难题,通过现场试验研究出一种边采煤边回撤的新方法,距离停采线35 m时开始在综采支架前铺网护顶,距离停采线20 m时开始在综采支架间打设锚索,距离停采线5 m时拆除端头支架尾部的活动挡矸板并同步打设戗棚和木垛,当工作面推采至停采线时回撤端头T3和T4铺网支架,并同步将挡矸支架前移至停采线,然后将挡矸支架分前中后3段依次回撤。实践证明,该方法安全可靠,实现了采煤—回撤—留巷一体化,未对工作面采煤、回撤和留巷速度产生明显影响,满足陕北矿区和神东矿区高产高效工作面沿空留巷要求。Based on theoretical calculation and actual working conditions,a large composite gangue blocking support with a length of 19 m,roof control area of 38 m^(2) and gangue blocking area of 61m^(2)was developed to meet the technical requirements of 12~15 m working face.Aiming at the problem of withdrawal of this large support,a new method of withdrawal while mining was studied through field test.When the distance from the stopping line was 35 m,the net roof protection was laid in front of the fully mechanized mining support.When the distance from the stopping line was 20 m,the anchor cable was set up between the fully mechanized mining supports.When the distance from the stopping line was 5 m,the movable gangue blocking baffle at the tail of the end support was removed and the closure shed and wood crib were set up synchronously.When the working face was pushed to the stopping line,the end T3 and T4 mesh supports were withdrawn.At the same time,the gangue support is moved forward to the stopping line,and then the gangue support is divided into three sections,which are retracted in turn.Practice has proved that the method is safe and reliable,and realizes the integration of coal mining-retraction-retaining roadway.It has no obvious influence on the speed of working face mining,withdrawal and retaining roadway,and meets the requirements of gob-side entry retaining in high-yield and high-efficiency working face in northern Shaanxi and Shendong mining areas.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49