基于作业分析法的M车间组装线优化研究  

Research on the Optimisation of Assembly Line in Workshop M Based on Job Analysis Method

在线阅读下载全文

作  者:王光玉 刘俊艳[1] Wang Guangyu;Liu Junyan(College of Economics and Management,Qingdao University of Science and Technology,Qingdao Shandong 266000,China)

机构地区:[1]青岛科技大学经济与管理学院,山东青岛266000

出  处:《现代工业经济和信息化》2024年第2期200-203,共4页Modern Industrial Economy and Informationization

摘  要:针对某电子加工企业M车间PSS装配线作业台面布局不合理、作业不标准、产线效率低下等问题,通过作业分析方法对PSS装配过程进行分析优化。生产线平衡率由之前的48.89%提升为85.5%,生产效率得到提高,生产过程更加流畅。损失率由之前51.51%降低至14.5%,作业人数从23人减少到17人,直接降低人工成本,间接降低管理成本,有益于企业效益的增加。Aiming at the problems of irrational layout of work table,non-standard operation and low efficiency of production line in PSS assembly line of M workshop of an electronic processing enterprise,the PSS assembly process was analysed and optimized through job analysis method.The balance rate of the production line is increased from 48.89%to 85.5%,the production efficiency is improved,and the production process is smoother.The loss rate is reduced from previous 51.51%to 14.5%,and the number of operators is reduced from 23 to 17,which directly reduces the labour cost and indirectly reduces the management cost,which is beneficial to the increase of enterprise benefit.

关 键 词:工业工程 作业分析 ECRS原则 产线平衡 

分 类 号:F426[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象