检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李成业[1] 王万金[1] 王亚军 刘豪 郑海川[1] Li Chengye;Wang Wanjin;Wang Yajun;Liu Hao;Zheng Haichuan(Nuclear Power Institute of China,Chengdu,610213,China)
出 处:《核动力工程》2024年第2期214-217,共4页Nuclear Power Engineering
摘 要:为充分利用辐照后燃料组件,结合其密集型和重量轻的特点,提出了一种燃料组件的修复工艺,设计了一套辐照后燃料组件修复系统,对关键零部件进行了详细设计并采用ANSYS软件进行抗震校核。结果表明,燃料组件修复系统主体框架应力和变形均满足要求;通过工程试验样机验证,辐照后燃料组件修复系统能够安全可靠地实现具有密集型棒束特点的燃料组件的拆卸和复装作业,为辐照后燃料组件再次入堆创造了条件。In order to make full use of the post-irradiation fuel assembly,a fuel assembly repair process was proposed,and a repair system for post-irradiation fuel assembly was designed based on the dense and lightweight characteristics of the fuel assembly.Main parts were designed in detail and checked by seismic analysis using ANSYS.The results show that the stress and deformation of the main frame of the fuel assembly repair system meet the requirements.It is verified by the engineering test prototype that the system could dismantle and assemble the post-irradiation fuel assembly safely and reliably,and created conditions for the return of the fuel assembly.
分 类 号:TL352[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117