检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金科 JIN Ke(Huizhou Huayu Water Resources and Hydropower Engineering Survey and Design Co.,Ltd.,Huizhou 516000,China)
机构地区:[1]惠州市华禹水利水电工程勘测设计有限公司,广东惠州516000
出 处:《云南水力发电》2024年第4期144-147,共4页Yunnan Water Power
摘 要:城市公园护堤挡墙肩负着片区的防洪安全和生态景观重任,保障其安全尤为重要。以滨江公园护堤挡墙除险加固治理工程为例,针对其挡墙现有结构不满足受力要求,地基沉降影响,挡墙多处出现钢筋保护层脱落、钢筋锈蚀、挡墙倾斜变形、墙顶路面沉陷等安全隐患和险情进行除险加固治理,并对滨江公园段护堤挡墙进行加固治理。对加固方案的挡墙稳定性复核验算,满足了加固需求。The retaining walls of urban park embankments shoulder the responsibility of flood control safety and ecological landscape in the area,and ensuring their safety is particularly important.This paper takes the example of the reinforcement and treatment project for the retaining wall of the Binjiang Park embankment,aiming to address the fact that the existing structure of the retaining wall does not meet the stress requirements.Due to the influence of foundation settlement,safety hazards and dangers such as steel reinforcement protection layer detachment,steel reinforcement corrosion,inclined deformation of the retaining wall,and settlement of the wall top and road surface have appeared in multiple locations of the retaining wall.This paper focuses on the reinforcement and treatment of the embankment and retaining wall in Binjiang Park section.At the same time,the stability of the retaining wall in the reinforcement plan was rechecked and verified,meeting the reinforcement requirements.
分 类 号:TV871.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.143.199