明挖综合管廊模板台车整体浇筑施工技术  被引量:1

Construction Technology for Integral Pouring of Formwork Trolley for Open Cut Comprehensive Pipe Gallery

在线阅读下载全文

作  者:陈飞 CHEN Fei(China Railway 17th Bureau Group Third Engineering Co.,Ltd.,Shijiazhuang 050000,China)

机构地区:[1]中铁十七局集团第三工程有限公司,石家庄050000

出  处:《价值工程》2024年第11期75-78,共4页Value Engineering

摘  要:本文通过设计管廊新型模板台车,实现了台车的多方向移动,并通过台车各子系统位置多方向调节和锁定,能够简单、快速、精确地实现管廊主体模板安装;同时设计了新型混凝土浇筑装置,优化了竖(隔)墙混凝土浇筑布料、整平和振捣工艺;解决了传统支架模筑法施工效率低、易出现质量问题、施工成本高和文明施工程度低的难题,取得了良好的效果,为类似工程提供了具有价值的参考实例和经验。This article designs a new type of template trolley for the pipe gallery,achieving multi-directional movement of the trolley.By adjusting and locking the positions of each subsystem of the trolley in multiple directions,the installation of the main template for the pipe gallery can be easily,quickly,and accurately achieved.At the same time,a new type of concrete pouring device was designed,and the vertical(partition)wall concrete pouring fabric,leveling,and vibration technology were optimized.The problems of low construction efficiency,easy quality problems,high construction cost,and low level of civilized construction in traditional bracket formwork construction methods are solved,good results have been achieved,and it provides valuable reference examples and experience for similar projects.

关 键 词:综合管廊 明挖 模板台车 浇筑施工 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象