检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡天然 HU Tianran(International Company of China Railway No.2 Engineering Group Co.,Ltd.,Chengdu 610306,China)
机构地区:[1]中铁二局集团有限公司国际公司,成都610306
出 处:《路基工程》2024年第2期191-194,共4页Subgrade Engineering
摘 要:依托南亚某国特长引水隧道工程,对影响小断面双护盾TBM施工进度的地质条件、资源组织、技术方案、环境等因素进行分析,通过科学的管理理念和多种技术措施,以及适宜的制度建设和精细化的过程控制,提升掘进效率,TBM施工进度屡次实现重大突破。Relying on the extra-long water diversion tunnel project in a South Asian country,the geological,resource organization,technical scheme and environmental and other factors affecting the construction progress of the small section double-shield TBM are analyzed.Through scientific management concepts and a variety of technical measures,as well as appropriate system construction and refined process control,the excavation efficiency has been improved,and the TBM construction schedule has repeatedly achieved major breakthroughs.
关 键 词:复杂条件 双护盾TBM 超前预报 五步注浆 快速掘进 风险管控 经济性
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227