核电项目文档工作前端控制、全程管理研究  

Research on the Front-end Control and Whole-course Management of Nuclear Power Project Documents Work

在线阅读下载全文

作  者:王明华 Wang Minghua(Taishan Nuclear Power Joint Venture Co.,Ltd.,Jiangmen 529228,China)

机构地区:[1]台山核电合营有限公司,江门529228

出  处:《办公自动化》2024年第7期14-16,共3页Office Informatization

摘  要:核电项目建设周期厂,从前期勘察、厂址选择、设计、再到负挖施工、土建、安装、调试和试运行,整个工程完成项目竣工需十余年,这个过程中所产生的项目文件不仅数量巨大、类型复杂而且时间跨度长、涉及合作单位多。核电项目文档工作要以文件生命周期理论为指导,采取覆盖项目建设本单位和各合作单位的前端控制、全程管理措施。The construction cycle of nuclear power project is very long.From preliminary investigation,site selection,engineering design to negative excavation,civil engineering,installation,commissioning,trail operation,the whole project takes more than ten years to complete.In the process,a large number of project documents will be generated.In addition to the huge quantity,the project documents are complicated,long duration and involving many cooperative units.The nuclear power project document work must be guided by document life cycle theory,adopt front-end control,whole-course management measures to conduct the construction unit and cooperative units.

关 键 词:核电文档 项目建设周期 前端控制 全程管理 

分 类 号:TM623[电气工程—电力系统及自动化] G270.71[文化科学—档案学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象