检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李悦 宁哲 晏勇 单宏兰 罗安然 LI Yue;NING Zhe;YAN Yong;SHAN Honglan;LUO Anran(School of Civil Engineering,North China University of Technology,Beijing 100144,China;Zhonghe Dehui Engineering Technology Co.,Ltd.,Beijing 100070,China)
机构地区:[1]北方工业大学土木工程学院,北京100144 [2]中和德汇工程技术有限公司,北京100070
出 处:《吉首大学学报(自然科学版)》2024年第2期45-55,共11页Journal of Jishou University(Natural Sciences Edition)
基 金:National Natural Science Foundation of China(51408009);Basic Research Funds for Universities in Beijing(110052971921/062)。
摘 要:为了探讨多跨曲线连续梁桥的抗震性能和减隔震方法,对基于摩擦摆球型支座的多跨曲线连续梁桥构建了有限元模型,并进行了动力特性和非线性时程分析.结果表明,桥梁模型的纵向刚度弱于横向刚度,且第1阶振型对桥墩纵向地震反应贡献较大,振型参与系数为29.8%,第6阶振型对桥墩横向地震反应贡献较大,振型参与系数为20%;在E1地震作用下,设置的摩擦摆球型支座能够使桥梁保持弹性工作状态,且支座变形和伸缩缝宽度满足要求;在E2地震作用下,部分桥墩的截面最大弯矩需求大于截面的抗弯承载能力,而进一步的桥墩强度验算发现,结果均满足抗震需求.To study the seismic performance and vibration isolation method of multi-span curved continuous girder bridge,a finite element model is established for the multi-span curved continuous girder bridge with friction pendulum spherical bearings,and the dynamic characteristics and nonlinear time analysis is carried out.Results show that the longitudinal stiffness of the bridge model is weaker than the transverse stiffness,and the first-order vibration mode contributes more to the longitudinal seismic response of the bridge pier,and the vibration mode participation coefficient is 29.8%;the sixth-order vibration mode contributes more to the transverse seismic response of the bridge pier,and the vibration mode participation coefficient is 20%;under the E1 earthquake,the friction pendulum spherical bearing can keep the bridge in elastic working condition,and the bearing deformation and expansion joint width meet the requirements,which proves the effectiveness of the selected and arranged friction pendulum spherical bearing;under the E2 earthquake,the maximum bending moment demand of the section of some piers is greater than the bending capacity of the section,but further strength tests were carried out on the piers,and they all meet the seismic demand.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.254.237