检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐伟[1] 王智林 张建宁[2] 黄耀[2] XUWei;WANG Zhilin;ZHANG Jianning;HUANG Yao(Exploration and development Research Institute of Jiangsu Oilfield Company,SINOPEC,Yangzhou 225009,China;No.1 oil Plant of Jiangsu Oilfield Company,SINOPEC,Yangzhou 225265,China)
机构地区:[1]中国石化江苏油田分公司勘探开发研究院,江苏扬州225009 [2]中国石化江苏油田分公司采油一厂,江苏扬州225265
出 处:《复杂油气藏》2024年第1期86-91,共6页Complex Hydrocarbon Reservoirs
基 金:中国石化科技攻关项目“百万吨CO_(2)驱油封存示范应用技术研究”(P22180-2);中国石化江苏油田科技攻关项目“中高含水油藏CO_(2)驱提高采收率关键技术政策研究”(JS22010)。
摘 要:油田经过长期注水开发进入高含水阶段,产量下降较快以至停采,对停采的高含水油藏开展剩余油分布规律的再认识可以有效提高老油田采收率。为此开展了平板物理模拟实验,利用含油饱和度场分布对剩余油二次富集机理进行研究;同时结合数值模拟研究,验证了高部位区域剩余油分布规律,并对其主控影响因素进行分析。结果表明,剩余油受到残余阻力压差以及渗吸的作用,二次富集主要分布在注采连线的周边以及渗透率较低的高部位地区。确定了影响剩余油二次聚集的影响因素及技术界限值,即油藏满足停采时间超过36个月,地层倾角大于20°,平面渗透率级差大于2,渗透率大于50×10^(-3)μm^(2)等条件可开展油田高含水停采油藏二次挖潜。After a long period of water injection and development,the oilfield enters the high water-cut stage,and the production decreases rapidly and even stops.Re-understanding the distribution law of remaining oil in the stopped production reservoirs with the high water-cut can effectively improve the recovery efficiency of old oilfields.For this reason,a plate physical simulation experiment was carried out to study the mechanism of secondary enrichment of residual oil by using the distribution of the oil saturation field.At the same time,combined with a numerical simulation study,the distribution law of remaining oil in the high position area was verified,and the main controlling factors were analyzed.The results show that the residual oil is affected by the residual resistance pressure difference and imbibition,and the secondary enrichment is mainly distributed in the peripheral areas of the injection-production line and the high areas with low permeability.The influencing factors and technical limits affecting the secondary accumulation of remaining oil are determined,i.e.,the secondary exploitation can be carried out in a stopped production reservoir with the high water cut if the reservoir meets the conditions such as the stoppage time exceeds 36 months,the formation dip angle is more than 20°,the plane permeability difference is greater than 2,and the permeability is more than 50×10^(-3)μm^(2).
分 类 号:TE327[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222