检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李翔波 龚祥云 LI Xiangbo;GONG Xiangyun(State Grid Henan Electric Power Company Shangqiu Power Supply Company,Shangqiu 476000,China)
机构地区:[1]国网河南省电力公司商丘供电公司,河南商丘476000
出 处:《电工技术》2024年第5期208-210,共3页Electric Engineering
摘 要:针对传统的变电站监控信息验收方式采用逐点实传、人工核对的方式,耗时耗力,提出了一种监控信息自动验收解决方法,采用专用工具模拟变电站内间隔层设备,自动触发信号至主站,满足全回路验收要求。Conventional pre-acceptance examination method of substation monitoring information uses point-to-point real transmission and manual verification,which is time-consuming and labor-intensive.This paper proposes a solution for automated pre-acceptance examination of monitoring information,which uses a dedicated tool to simulate the equipment in bay-layer of the substation and automatically trigger signals to the master station,meeting the requirements for full circuit examination.
分 类 号:TM769[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.225