作 者:彭志豪[1] 陈海燕[1] PENG Zhihao;CHEN Haiyan(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou 510290,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510290
出 处:《水运工程》2024年第4期37-41,共5页Port & Waterway Engineering
摘 要:针对重力式码头升级改造新建板桩墙方案板桩墙后土压力分布问题,开展新建板桩墙距已有重力式墙身不同距离的土压力分布规律研究。采用有限元数值模拟和理论公式计算对比分析,得出作用在前板桩墙上的土压力小于理论主动土压力,即存在贮仓效应的结论。建议重力式码头改造工程设置前板桩墙时,采用公式合理选取贮仓尺寸,或根据新建板桩墙距已有码头墙身的距离采用有限元计算作用在板桩墙上的土压力,避免保守或激进设计。In response to the problem of soil pressure distribution behind the newly built sheet pile wall in the upgrading and renovation of gravity walls,the paper studies the distribution law of soil pressure at different distances between the newly built sheet pile wall and the existing gravity wall.Finite element numerical simulation and theoretical formula calculation are used to compare and analyze the distribution of soil pressure.It is concluded that the soil pressure acting on the front sheet pile wall is less than the theoretical active soil pressure,indicating there is a silo effect.It is suggested that when the front sheet pile wall is installed in the gravity wharf reconstruction project,the size of the silo should be rationally selected by the formula,or the soil pressure exerted on the sheet pile wall should be calculated by the finite element method according to the distance between the newly built sheet pile wall and the existing wharf wall,to avoid conservative or radical design.
关 键 词:重力式码头 升级改造 新建板桩墙 贮仓压力 土压力分布
分 类 号:U656.1[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.14.137.94