检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈富[1,2,3] 陈默 CHEN Fu;CHEN Mo(Harbin Institute of Technology,Harbin 150001,China;CCCC Guangdong-Hong Kong-Macao Greater Bay Area Innovation Research Institute,Shenzhen 518000,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;No.1 Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China)
机构地区:[1]哈尔滨工业大学,黑龙江哈尔滨150001 [2]中交集团粤港澳大湾区创新研究院,广东深圳518000 [3]中交第一航务工程局有限公司,天津300461 [4]中交一航局第一工程有限公司,天津300461
出 处:《水运工程》2024年第4期183-188,共6页Port & Waterway Engineering
摘 要:真空预压与真空井点降水两种工艺均可用于软土地基处理,表观上两者都是通过抽真空使土体内孔隙水排出并使软土沉降,但目前对两者的工艺和机理等关键差异的认识不深入,难以有效指导现场施工。真空预压和真空井点降水在抽真空设备、竖向排水通道和密封边界等设备与工艺方面有显著差异;两者的的排水机理也有着本质区别。真空预压的加固机理是负压作用下土体发生塑料排水板水平向排水固结,同时塑料排水板内的水向上流动与重力无关;真空井点降水的加固机理是群井抽水引起地下水位降低,土体的浮重度变为湿重度导致荷载增大使土体沉降,同时井点管内的水向上流动受重力影响。在工艺和机理的差异分析的基础上,进一步明确了真空预压和真空井点降水在10个关键方面的差异,包括加固机理、影响深度、不同深度的真空传播、土体水平变形、竖向排水与重力的关系、抽真空位置影响、与外界是否连通、影响区成因、地下水位变化、是否形成非饱和带。Both vacuum preloading and vacuum well dewatering can be used for the improvement of soft soil foundation.Apparently,both of them drain out pore water through vacuum and make the soft soil consolidate.However,if the understanding of the key differences between the two technologies and mechanisms is not clear,it is difficult to effectively guide the on-site construction.There are significant differences between vacuum preloading and vacuum well dewatering in vacuum pumping equipment,vertical drainage channels and sealing boundaries.The drainage mechanism of the two is also fundamentally different.The mechanism of vacuum preloading is that the soil mass is consolidated horizontally towards prefabricated vertical drains(PVD)under negative pressure difference,and the upward flow of water in the PVD is independent of gravity.The mechanism of the vacuum well dewatering is that the groundwater level decreases due to the pumping of group wells,thus makes the soil unit weight to change from buoyant unit weight to the wet unit weight,resulting in additional loading and consolidation,and the water inside the well pipe is affected by gravity.On the basis of the difference analysis of process and mechanism,the differences between vacuum preloading and vacuum well dewatering in 10 key aspects are further clarified,including reinforcement mechanism,influence depth,vacuum propagation at different depths,soil horizontal deformation,relationship between upwards water flow and gravity,influence of vacuum pumping location,connectivity state with the outside environment,cause of influence area,changes in groundwater level,and formation of unsaturated zone.
关 键 词:真空预压 真空井点降水 软基处理 机理 排水固结 差异分析
分 类 号:U655[交通运输工程—港口、海岸及近海工程] TU472[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.71