检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卿小虎 Qing Xiaohu(RCC Harbour&Channel Engineering Bureau Group General Contracting Company,Zhuhai,Guangdong 519000)
机构地区:[1]中国铁建港航局集团有限公司总承包分公司,广东珠海519000
出 处:《现代工程科技》2024年第6期21-24,共4页Modern Engineering Technology
摘 要:旨在研究污水管网水平挡土板支护相关计算及施工控制要点。以博罗县龙溪街道污水支管网完善工程设计项目为案例,重点对沟槽开挖宽度和水平挡土板支护处受力进行验算分析,论述了污水支管网完善工程施工过程中的控制要点,希望能够为施工过程提供指导,确保施工安全。Intended to study the calculation and construction control points related to horizontal retaining plate support for sewage pipeline network.Taking the design project of the sewage branch network improvement project in Longxi Street,Boluo County as a case study,the focus is on checking and analyzing the excavation width of the trench and the stress at the horizontal retaining plate support.The control points during the construction process of the sewage branch network improvement project are discussed,hoping to provide guidance for the construction process and ensure construction safety.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.114.63