水电工程TBM洞挖料资源化利用对策与思考  被引量:1

Countermeasures and Thoughts on Resource Utilization of TBM Excavated Materials in Hydropower Projects

在线阅读下载全文

作  者:何佳龙 喻葭临[1] 李祥[1] 何伟[1] 常作维 HE Jia-long;YU Jia-lin;LI Xiang;HE Wei;CHANG Zuo-wei(China Renewable Energy Engineering Institute,Beijing 100120,China)

机构地区:[1]水电水利规划设计总院,北京100120

出  处:《水电能源科学》2024年第4期107-110,共4页Water Resources and Power

摘  要:针对TBM洞挖料的综合利用率偏低、难以满足新形势下更高水平的绿色施工要求等问题,结合TBM洞挖料的材料特性及处理现状,分别从混凝土骨料、堆石坝筑坝材料及其他用途等方面开展了TBM洞挖料潜在利用方式的可行性讨论,提出了TBM洞挖料资源化利用需要关注的问题、常规处理手段及未来应用趋势,研究结果可为推动TBM洞挖料综合利用研究和创新实践方向提供参考。In response to the low comprehensive utilization rate of TBM excavated materials and the difficulty in meeting the requirements of a higher level of green construction under the new situation,combined with the characteristics and application status of TBM excavated materials,the potential utilization feasibility of TBM excavated materials has been discussed from the aspects of concrete aggregates,rockfill dam construction materials,etc.At the same time,the issues needing attention,conventional treatment methods and future application trends for resource utilization of TBM excavated materials have been put forward,which can provide beneficial references for promoting the comprehensive application research and innovative practical directions of TBM excavated materials.

关 键 词:TBM 洞挖料 水电工程 资源化利用 绿色施工 

分 类 号:TV42.2[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象