检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘增祥 武俊宝 Liu Zengxiang;Wu Junbao(Shanxi Construction Investment Group Co.,Ltd.,Jincheng,030032,China)
出 处:《青海交通科技》2023年第3期115-120,共6页Qinghai Transportation Science and Technology
摘 要:丹河大桥为(130+130)m独塔双索面组合梁斜拉桥,结构为半飘浮体系,主塔采用“水滴”形造型,采用支架拼装施工。对如何确定桥梁合理成桥状态,确保桥梁内力安全以及达到目标线形进行了阐述,并对施工过程中索力调整以及主塔临时措施进行了阐述。分析了独塔双索面组合梁斜拉桥的合理成桥状态、受力特性及目标线形,提出了施工过程中索力调整与主塔临时措施方案。结果表明:主梁、主塔、斜拉索在各个施工阶段状态下,均满足施工控制的安全及精度要求,成桥阶段达到了理想线形,内力状态合理,满足设计要求。Danhe bridge is a cable-stayed bridge with a main span of(130+130)m,constructed by bracket assembly.It adopts drop-type single tower and composite girder,and semi floating structural system.The article gives the method how to determine a reasonable bridging state,to insure the safety during construction and the bridge deck elevation.In this paper,the rational construction state,mechanical characteristics and target alignment of the single-tower double-cable-plane composite beam cable-stayed bridge are analyzed,and the adjustment of cable force and the temporary measures of the main tower during construction are put forward.The calculation results show that,the main beam,pylon,cable meet the control requirements during construction.The bridge meets the design state both the elevation and the internal force state.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.201.27