检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海东[1] 姜命强[1] 赵永磊[1] Wang Haidong;Jiang Mingqiang;Zhao Yonglei(Sinohydro Engineering Bureau 8th Co.,Ltd.,Changsha,Hu'nan 410002,China)
机构地区:[1]中国水利水电第八工程局有限公司,湖南长沙410002
出 处:《中国建筑防水》2024年第4期30-33,40,共5页China Building Waterproofing
摘 要:赣江下游尾闾综合整治工程4支枢纽采用TRD工法对防渗墙进行施工,并针对重难点区段调整了施工工艺,该做法克服了地质条件复杂、砂卵砾石地层厚度大、防渗墙深度大等不利因素的影响,施工效率高且安全环保,取得了良好的防渗效果。TRD construction method is adopted for the anti-seepage wall construction of the four branches of the comprehensive renovation project of the lower reaches of Ganjiang River,and the construction technology is adjusted as per the important and difficult sections.This method overcomes the adverse factors such as complex geological conditions,large sand gravel formation thickness and deep anti-seepage wall.The construction efficiency is high and the construction is safe and environment friendly,and good anti-seepage effect has been achieved.
分 类 号:TV61[水利工程—水利水电工程] TU761.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.64.200