检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王泽军[1] Wang Zejun(Hangzhou Guodian Dam Safety Engineering Co.,Ltd.,Hangzhou,Zhejiang 310000,China)
机构地区:[1]杭州国电大坝安全工程有限公司,浙江杭州310000
出 处:《中国建筑防水》2024年第4期34-40,共7页China Building Waterproofing
摘 要:针对景洪水电站12#—13#坝段结构横缝渗漏水问题,通过前期水下ROV检查及相关监测数据分析,项目设计采用结构横缝水下化学灌浆结合上游面水下设置表面接缝止水的方案,具体做法为采用LW/HW环保型水溶性聚氨酯灌浆材料封堵渗漏通道,并采用SR防渗体系封闭表面接缝。该做法消除了横缝渗漏,防渗效果显著。In view of the water leakage in the transverse joint of dam section 12#—13# of Jinghong Hydropower Station,the project has designed a scheme of using underwater chemical grouting for the transverse joint of the structure and setting surface joint water sealing on the upstream underwater surface through earlier underwater ROV inspection and analysis of relevant monitoring data.The specific method is to use LW/HW environmental-friendly water-soluble polyurethane grouting material to block the leakage channel,and the surface joint is sealed by SR anti-seepage system.This method eliminates the leakage of the transverse joint,and the anti-seepage effect is remarkable.
关 键 词:水电站 结构横缝渗漏 ROV水下检查 水下施工 化学灌浆 SR表面接缝止水
分 类 号:TV61[水利工程—水利水电工程] TU761.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7