泥水平衡法顶管在市政工程施工中的应用  被引量:1

Application of Mud Water Balance Method for Pipe Jacking in Municipal Engineering Construction

在线阅读下载全文

作  者:坚洪坤 JIAN Hongkun(Winbond Construction Group Co.,Ltd.,Weifang 262500,Shandong,China)

机构地区:[1]山东华邦建设集团有限公司,山东潍坊262500

出  处:《工程技术研究》2024年第3期74-76,共3页Engineering and Technological Research

摘  要:文章主要分析了泥水平衡法顶管施工技术的工作原理和技术类型,并详细阐述泥水平衡法顶管技术方法,包括顶管机出洞、正常段顶进施工、顶管出洞、注浆减阻、顶管纠偏控制。研究表明,上述施工措施的采取有利于规范泥水平衡法顶管施工操作,明确工程侧重点,从而推进市政工程项目顺利开展,保障工程整体质量。This study mainly analyzes the working principle and technical types of the slurry water balance method for pipe jacking construction,and elaborates on the slurry water balance method for pipe jacking technology,such as pipe jacking machine excavation,normal section jacking construction,pipe jacking excavation,grouting resistance reduction,and pipe jacking correction control.Research has shown that the adoption of the above construction measures is conducive to standardizing the mud water balance method for pipe jacking construction,clarifying the key points of the project,promoting the smooth implementation of municipal engineering projects,and ensuring the overall quality of the project.

关 键 词:市政工程 泥水平衡法 顶管施工 

分 类 号:TU99[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象