检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨德厚 YANG Dehou(CCCC Second Highway Consultants Co.,Ltd.,Wuhan 430050,Hubei,China)
机构地区:[1]中交第二公路勘察设计研究院有限公司,湖北武汉430050
出 处:《工程技术研究》2024年第4期4-7,共4页Engineering and Technological Research
摘 要:文章利用有限元软件Midas Fea模拟了矮塔斜拉桥在塔梁同步施工工艺下塔梁固结部位局部实体模型,并与典型施工阶段下整体计算模型和施工监控实测数据进行了对比,分析总结了采用塔梁同步施工工艺的矮塔斜拉桥,在不同施工阶段塔梁固结部位的截面应力变化规律。This paper uses finite element software Midas Fea to simulate the local solid model of the tower-beam consolidation part of the extradosed cable-stayed bridge under the tower-beam synchronous construction technology,and compares it with the overall calculation model and the construction monitoring data under the typical construction stage.The section stress variation law of the tower-beam consolidation part of the extradosed cable-stayed bridge with tower-beam synchronous construction technology at different construction stages is analyzed and summarized.
分 类 号:U448.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90