检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王秋霞[1] Wang Qiuxia(Shanxi Water Resources and Hydropower Survey and Design Institute Co.,Ltd.,Taiyuan,Shanxi 030024,China)
机构地区:[1]山西省水利水电勘测设计研究院有限公司,山西太原030024
出 处:《山西水土保持科技》2024年第1期47-49,共3页Soil and Water Conservation Science and Technology in Shanxi
摘 要:本研究以万家寨引黄南干线滹沱河连通工程天然输水河道长畛河、阳武河为研究区域,调查和评价工程未建设前土壤盐碱化现状水平,在此基础上,按照土壤环境影响评价导则,采取土壤盐化综合评分预测方法,定量预测应急输水期对沿河两岸土壤环境盐化的影响,为工程建设可持续利用提供依据。Based on the investigation and evaluation of the soil salinization level before the construction of the project,this study takes the Hutuo River and Yangwu River as the study area,in accordance with the guidelines for Soil Environmental Impact Assessment,the impact of emergency water transfer period on soil salinization on both banks of the river was quantitatively predicted using a comprehensive soil salinization scoring method to provide a basis for the sustainable use of the project.
关 键 词:滹沱河连通工程 土壤盐渍化 土壤盐化综合评分预测方法
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.55.240