作 者:陈宇县 李娜[2] CHEN Yu-xian;LI Na(Beihai Hehai Water and Power Design Institute Co.,Ltd.,Beihai 536000,China;Nanning College of Vocational Technology,Nanning 530007,China)
机构地区:[1]北海河海水利水电设计院有限责任公司,广西北海536000 [2]南宁职业技术学院,南宁530007
出 处:《广西水利水电》2024年第2期74-77,共4页Guangxi Water Resources & Hydropower Engineering
摘 要:驮英水库需进行泄洪建筑物方案布置比选,首先采用“单独溢洪道”与“溢洪道+泄洪洞”联合泄洪等两种泄洪方式从结构安全、运行调度、防汛抢险、工程投资等方面进行比选,确定“溢洪道+泄洪洞”联合泄洪的泄洪方式。从结构安全、运行调度、防汛抢险、工程投资等方面对“左岸溢洪道”及“右岸溢洪道”进行方案比选,最终确定水库的泄洪建筑物的布置方案。For the design of flood-relief structure of Tuoying Reservoir,the joint flood discharging scheme consisting of overflow spillway and spillway tunnel was selected after it was compared with the single overflow spillway alternative in respects of structural safety,operation and control,flood protection,construction cost etc.,based on which left bank spillway scheme was compared with right spillway alternative in respects of structural safety,operation and control,flood protection,construction cost etc.before the layout scheme was determined finally.
关 键 词:单独溢洪道 溢洪道+泄洪隧洞 泄洪方案 驮英水库