大藤峡右岸厂坝工程施工重难点及其对策  

Key points,difficulties and countermeasures in the construction of right bank powerhouse and dam of Datengxia Gorge Water Conservancy Project

在线阅读下载全文

作  者:张松涛 谢济安 熊丰 ZHANG Song-tao;XIE Ji-an;XIONG Feng(Guangxi Datengxia Gorge Water Conservancy Development Co.Ltd.,Guiping 537200,China)

机构地区:[1]广西大藤峡水利枢纽开发有限责任公司,广西桂平537200

出  处:《广西水利水电》2024年第2期92-95,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:大藤峡水利枢纽右岸厂坝工程建设难度大,工期紧张,多项指标处于国内外领先水平,技术复杂。通过对导截流、混凝土浇筑、金结与机电安装等施工中重点和难点的辨识,分析研究了相应的对策,围绕关键问题进行了技术攻关,制定了解决技术难题的具体措施,并将技术成果应用于工程实践,解决了工程难题。The construction of right bank powerhouse and dam of Datengxia Gorge Water Conservancy Project is characterized by much difficulties,tight schedule,multiple indicators at a leading level both at home and abroad,complex technology.The key points and difficulties of construction such as river diversion and closure,concreting,installation of metal works and electromechanical equipment were identified,based on which the authors studied corresponding countermeasures,conducted technical breakthroughs around key issues,formulated specific measures and applied the technological achievements to engineering practice to solve the technical difficulties.

关 键 词:施工重点 难点 对策 厂坝工程 大藤峡水利枢纽 

分 类 号:TV51[水利工程—水利水电工程]

 