作 者:刘赓劼 LIU Geng-jie(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)
机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023
出 处:《广西水利水电》2024年第2期120-121,共2页Guangxi Water Resources & Hydropower Engineering
摘 要:驮英水库工程建设征地移民投资101969.91万元,工程淹没区、工程建设区征地投资、移民安置投资均控制在初设批复范围内,移民安置工作比原规划总体提前14个月完成。本文总结了驮英水库技施阶段建设征地移民安置工作经验,可为今后开展类似项目提供参考。The costs of land acquisition and resettlement for the construction of Tuoying Reservoir Project is 1019.6991 million yuan.The costs of land acquisition and resettlement in submerged area and construction area are all controlled within the approved scope at the preliminary design stage.The resettlement work was completed 14 months ahead of the original plan.The author summarizes the experience in land acquisition and resettlement work at the construction drawing design stage of Tuoying Reservoir Project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.10.73