检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:解万文 文堪 王铧泰 刘远 周华荣 高昭伟 XIE Wanwen;WEN Kan;WANG Huatai;LIU Yuan;ZHOU Huarong;GAO Zhaowei(Western Mining Group Technology Development Co.Ltd,Xining 810006,China;Qinghai Provincial Key Laboratory of Plateau Mineral Processing Engineering and Comprehensive Utilization,Xining 810006,China;Qinghai Nonferrous Mineral Resources Engineering Technology Research Center,Xining 810006,China)
机构地区:[1]西部矿业集团科技发展有限公司,青海西宁810006 [2]青海省高原矿物加工工程与综合利用重点实验室,青海西宁810006 [3]青海省有色矿产资源工程技术研究中心,青海西宁810006
出 处:《中国有色冶金》2024年第2期114-120,共7页China Nonferrous Metallurgy
基 金:青海省科技计划项目(2022-GX-C10)。
摘 要:为综合回收锌冶炼烟尘及电解废液中的有价金属,本研究进行了利用锌电解废液浸出锌冶炼烟尘试验,通过一段浸出、碳酸钠中和沉锌及氢氧化钠中和沉镁等工序获得了沉锌产品和沉镁产品,通过两段浸出、萃取反萃、中和沉铟等工序获得了富铟渣及副产物铅银渣。试验最佳工艺条件:一段浸出为液固比4:1,浸出温度80℃,浸出时间75 min,在此条件下,锌浸出率可达78.69%,铟浸出率仅为8.4%;锌镁分离最佳终点pH值区间为6.86~7.80;二段浸出最佳工艺条件为终点pH值1.08,液固比3:1,浸出温度75℃,浸出时间10 h,在此条件下,铟浸出率可达86.84%。该研究可为炼锌厂开路除杂及综合回收有价金属提供新思路。In order to comprehensively recover valuable metals from zinc smelting fuel dust and electrolytic waste liquid,a synergistic treatment experiment of zinc smelting electrolytic waste liquid and oxygen pressure leaching zinc smelting fuel dust was researched,zinc and magnesium precipitation products were obtained through a process of leaching,neutralization of zinc precipitation with sodium carbonate,and neutralization of magnesium precipitation with sodium hydroxide,indiumrich slag and byproduct lead silver slag were obtained through two stage leaching,extractionstripping and indium neutralizationprecipitation,and the experimental conditions were optimized.The results show that the liquidsolid ratio is 4:1,the leaching temperature is 80℃,and the leaching time is 75 minutes.under these conditions,the zinc leaching rate can reach 78.69%,while the indium leaching rate is only 8.4%;the optimal endpoint pH range for zinc magnesium separation is 6.86 to 7.80;the endpoint pH value is 1.08,the liquidsolid ratio is 3:1,the leaching temperature is 75℃,and the leaching time is 10 h,which is the optimal process conditions for twostage leaching,under these conditions,the leaching rate of indium can reach 86.84%,which can provide new ideas for open circuit impurity removal and comprehensive recovery of valuable metals in zinc smelting plants.
关 键 词:氧压浸出 炼锌烟尘 炼锌电解废液 协同处理 综合回收 以废治废
分 类 号:TF813[冶金工程—有色金属冶金] TF843[环境科学与工程—环境工程] X758
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171