不同群桩沉降计算方法在崇明岛水闸工程中的应用分析  

Application Analysis of Different Pile Group Settlement Calculation Methods in Chongming Island Sluice Project

在线阅读下载全文

作  者:章笑 ZHANG Xiao(Shanghai Youwei Engineering Design Co.,Ltd.,Shanghai 200000,China)

机构地区:[1]上海友为工程设计有限公司,上海200000

出  处:《价值工程》2024年第12期118-121,共4页Value Engineering

摘  要:分别根据设计规范中主要推荐的等代墩基法、依据Mindlin解的Geddes法及等效作用分层总和法计算上海崇明老滧港南闸的群桩沉降,并与实测成果对比分析,结合各计算方法的特点,验证了各方法在本地区的适用性,最终证明等效作用分层总和法的计算成果与实测结果最为接近,但各方法的沉降计算成果都比实测值偏大。The settlement of pile groups at the South Gate of Chongming Laogang in Shanghai was calculated based on the main recommended equivalent pier foundation method in the design specifications,Geddes method based on Mindlin solution,and equivalent action layered sum method.The results were compared and analyzed with the measured values.Combined with the characteristics of each calculation method,the applicability of each method in the local area was verified.Finally,it was proved that the calculation results of the equivalent action layered sum method were closest to the measured results,but the settlement calculation results of each method were larger than the measured values.

关 键 词:群桩沉降 等代墩基法 Geddes法 等效作用分层总和法 附加应力 

分 类 号:TU473.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象