检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:唐爱鹏 TANG Aipeng(Changjiang Zhongxing Engineering Consultant(Fujian)Co.,Ltd.,Fuzhou 350000,China)
机构地区:[1]长江中兴工程顾问(福建)有限责任公司,福建福州350000
出 处:《水电与新能源》2024年第4期59-63,共5页Hydropower and New Energy
摘 要:为提高引调水及城市供水工程的供水流量和供水保证率,常采用多水源供水方式。通过增设配水井,可将输水线路和调节水库相连通,构建井库流量补偿式的配水系统。本文以福清市东张水库至洋边输水线路和里下底水库间的配水井工程为例,围绕配水井位置、型式和参数设计,对不同方案进行比选,分析井内流速、紊动能分布,确定最优设计方案。To improve the water supply flow and the guarantee rate of water diversion and urban water supply projects,multiple water source are often used for water supply.By adding water distribution wells,the water transmission lines and regulation reservoirs can be connected to form a well-reservoir flow compensation type water distribution system.Taking the water distribution well project connecting the Dongzhang Reservoir to Yangbian water transmission line and the Lixiadi Reservoir in Fuqing City as an example,several different design schemes are compared in terms of the location,type and parameters of the wells.The flow velocity and the turbulent energy distribution in the wells are analyzed to determine the optimal design scheme.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7