检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王雪羽 孙树彬 熊佳进 罗志辉 丛章健 官瑶 WANG Xueyu;SUN Shubin;XIONG Jiajin;LUO Zhihui;CONG Zhangjian;GUAN Yao(Hubei Qingjiang Hydroelectric Development Co.,Ltd.,Yichang 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《水电与新能源》2024年第4期71-74,共4页Hydropower and New Energy
摘 要:在水轮发电机组进行B级及以上检修或存在换瓦、轴线调整等检修项目时,需对弹性油箱进行受力调整,传统受力调整工艺效率较低,旧专用工具较为落后。文章介绍了在弹性油箱受力调整中优化调整量分配的方法。分配调整量后先带入公式计算,满足合力矩要求后再进行受力调整,并采用创新设计的新式专用工具,能减少受力调整中的人为误差,提高调整效率,减小调整次数,缩短工期。In the B-level or above maintenance of hydro-turbine generator units,or maintenance work such as tile replacement and axis adjustment,force adjustment of the elastic oil tank is usually necessary.Traditional force adjustment technique is of low work efficiency and the specialized tool is outdated.Thus,a method for optimizing the adjustment amount distribution in the force adjustment process is introduced.Firstly,the adjustment amount is assigned and inputted into the formula for calculation.When the torque requirement is satisfied,the force adjustment process is then carried out Also,new specialized tools are designed,which can reduce the human errors in the force adjustment,improve the work efficiency,reduce the number of adjustment,and shorten the construction period.
分 类 号:TK730.45[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7