检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李锐 LI Rui(Sinohydro Bureau 9 Co.Ltd.,Guiyang 550081,China)
机构地区:[1]中国水利水电第九工程局有限公司,贵阳550081
出 处:《工程建设与设计》2024年第7期174-176,共3页Construction & Design for Engineering
摘 要:结合涔天河水库扩建工程西干渠标段渡槽施工,以单跨最高高度58m的弄石渡槽为研究对象,分析工程施工的主要难点,提出采用高大组合支撑体系施工技术,对渡槽支撑体系主要结构设计进行详细阐述。实践证明,高大组合支撑体系施工技术能够减少支撑体系基础混凝土和钢管的用量,节约工程建设投资,降低施工安全风险,大大加快工程施工进度。Combined with the aqueduct construction of the West Trunk Canal section of the expansion project of Centianhe Reservoir,this paper takes the single-span Nongshi aqueduct with the highest height of 58 m as the research object,analyzes the main difficulties of the construction,puts forward the construction technology of tall composite support system,and expounds the main structural design of the aqueduct support system in detail.Practice has proved that the construction technology of the tall composite support system can reduce the amount of concrete and steel pipe in the foundation ofthe support system,save project construction investment,reduce construction safety risks,and greatly accelerate theconstruction progress.
分 类 号:TV672.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.2.200