检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜航 孙成龙[1] 郭凌[1] 王权 尚士鑫 Du Hang;Sun Chenglong;Guo Ling;Wang Quan;Shang Shixin(Gas Branch Plant of Energy and Environment Management Department of Angang Steel Co.,Ltd.,Anshan 114021,Liaoning,China)
机构地区:[1]鞍钢股份有限公司能环管理部燃气分厂,辽宁鞍山114021
出 处:《冶金设备管理与维修》2024年第2期32-34,共3页Metallurgical Equipment Management and Maintenance
摘 要:分析了CCPP加压站存在的问题,制定了CCPP加压系统的优化方案。阐述了优化措施实施过程,并对于优化后试运行中出现的问题加以解决。实现了提升CCPP发电机组的发电效率,保障了CCPP加压站的稳定运行。This paper analyzes the problems existing in the CCPP pressurizing station,formulates the optimization scheme for the CCPP pressurizing system,expounds the implementation process of optimization measures,and solves the problems in the trial operation after optimization,thus improving the generating efficiency of the CCPP generator set and ensuring the stable operation of the CCPP pressurizing station.
分 类 号:TM611[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49