检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑河舟 ZHENG Hezhou(Building and Installing Engineering Co.,Ltd.of China Railway 12th Bureau Group,Taiyuan Shanxi 030024,China;China Railway 12th Bureau Group Co.Ltd.,Taiyuan Shanxi 030024,China)
机构地区:[1]中铁十二局集团建筑安装工程有限公司,山西太原030024 [2]中铁十二局集团有限公司,山西太原030024
出 处:《铁道建筑技术》2024年第4期136-140,共5页Railway Construction Technology
基 金:中铁十二局集团有限公司科技研发计划项目(2022-26)。
摘 要:钢桁架结构在施工过程中常伴有内力重分布,研究其在施工全过程中的结构内力变化规律与抗倒塌能力,对保障钢桁架结构的施工安全意义重大。本文以雄安科创园体育馆钢桁架施工为研究对象,采用现场实测与数值模拟相结合的方法进行施工全过程力学性能与抗倒塌性能分析。研究表明,实测数据与数值模拟结果吻合度较高,验证了数值模拟方法的有效性;经方案优化及论证,通过设置钢绞线辅助施工方法使得施工更为简单、快速、安全;单外侧钢柱失效并不能引起结构倒塌,双外侧钢柱失效具有倒塌风险,结构具有一定的安全储备。Steel truss structures are often accompanied by redistribution of internal forces in the construction process.It is of great significance to study the change of internal forces and collapse resistance in the whole construction process of steel truss structures.In this paper,the steel truss construction of Xiongan Science and Innovation Park Gymnasium is taken as the research object,and the mechanical properties and collapse resistance analysis of the whole construction process are studied by combining in-site measurement and numerical analysis.The results show that the measured data are consistent with the numerical simulation results,which verifies the validity of the numerical simulation method.Through the optimization and demonstration of the scheme,the construction is simpler,faster and safer by setting the auxiliary construction method of steel strand.The failure of single lateral steel column can not cause collapse of structure,while the failure of double lateral steel column has collapse risk,the structure has a certain safety reserve.
关 键 词:钢桁架 力学性能 抗连续性倒塌 现场实测 数值模拟
分 类 号:TU758.1[建筑科学—建筑技术科学] TU391
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7