检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张鹏 Zhang Peng
机构地区:[1]山西建筑工程集团有限公司,山西太原030000
出 处:《江苏建材》2024年第2期103-105,共3页Jiangsu Building Materials
摘 要:依托于风荷载对大跨度空间钢结构的影响理论以及大跨度空间钢结构施工阶段受风力振动的效应进行案例分析。在案例分析过程中基于BIM软件掌握大跨度空间钢结构的杆件数量、安装节点数量,并利用有限元计算分析软件开展施工模拟,依托于有限元软件的计算分析结果验证风力减振技术措施的成效并监测节点位移,从而为大跨度空间钢结构的施工与监测提供技术参考。Relying on the theory of the influence of wind load on long-span space steel structure and the effect of wind vibration during the construction stage of long-span space steel structure,a case study is carried out.In the case analysis process,based on the BIM software,the number of members and installed nodes of the long-span space steel structure are mastered,and the construction simulation is carried out by using the finite element calculation and analysis software,and the effectiveness of wind vibration reduction technical measures and the node displacement are monitored based on the calculation and analysis results of the finite element software,so as to provide a little technical reference for the construction and monitoring of the long-span space steel structure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.175.182