检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙艳清 代国强 SUN Yanqing;DAI Guoqiang(Binhu Coal Mine of Zaozhuang Mining Group Co.,Ltd.)
机构地区:[1]枣庄矿业集团有限责任公司滨湖煤矿
出 处:《现代矿业》2024年第3期99-103,共5页Modern Mining
摘 要:山西某矿2301工作面从切眼回采的过程中,沿空巷道受采动影响发生较大的围岩变形,严重影响了工作面的安全生产。借助简支梁力学模型,通过理论分析得出,影响巷道底鼓量的主要因素是巷道宽度和水平应力,同时采用FLAC3D数值软件模拟2种影响因素下巷道底鼓量的变化。结果表明:留巷宽度对巷道底鼓量的影响最为显著,现场布置沿空巷道时,应尽量避开构造应力集中区。根据模拟结果,并结合2301工作面具体地质条件,合理优化巷道断面尺寸,提高帮部支护强度和底板注浆锚索加固。The surrounding rock deformation of the goaf roadway was greatly affected by the mining movement,which seriously affected the safety production of the 2301 working face of a mine in Shanxi Prov⁃ince.Based on the mechanics model of simple supported beam,it is found that the main factors affecting roadway floor heave are roadway width and horizontal stress through theoretical analysis.At the same time,FLAC3D numerical software is used to simulate the changes of roadway floor heave under the two influencing factors.The results show that the width of roadway retention has the most significant effect on the floor heave volume of roadway,and the concentrated area of structural stress should be avoided as far as possible when the gob roadway is arranged on site.According to the simulation results and the specific geological condi⁃tions of the 2301 working face,the section size of the roadway is reasonably optimized,the support strength of the wall is improved and the anchor cable of the floor is reinforced by grouting.
关 键 词:沿空留巷 底鼓 FLAC3D数值模拟
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7