检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘仁涛[1] 盖兆梅 LIU Rentao;GAI Zhaomei(School of Municipal Engineering Technology,Heilongjiang Collage of Construction,Harbin 150025,China;College of Water Conservancy and Architecture,Northeast Agricultural University,Harbin 150030,China)
机构地区:[1]黑龙江建筑职业技术学院市政工程技术系,黑龙江哈尔滨150025 [2]东北农业大学水利与土木工程学院,黑龙江哈尔滨150030
出 处:《中国高新科技》2024年第6期126-128,共3页
摘 要:建设生产类项目和建设类项目水土流失预测方法大体相同,只有微弱的差异。差异性主要体现在预测时段划分、水土流失面积和土壤侵蚀模数的确定3个重要方面,由于其微弱性往往被许多学者忽视。文章从这三方面对建设生产类项目的水土流失预测展开研究,分析二者的共性与个性,以及在编制中的常见问题,并通过实例进行演练。Construction production project and construction project of soil erosion prediction methods are basically the same but also have a faint difference,difference mainly predict time,determine the area of soil erosion and soil erosion modulus of the three important aspects,due to its weak sex is often ignored by many scholars.In this paper,from the above three sides facing the construction of production projects of s soil erosion prediction study,analyzes the commonness and individuality,and the common problems in the preparation of practice and through the instance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200