复杂条件下回采巷道施工与支护技术优化  

Optimization of Roadway Construction and Supporting Technology under Complex Condition

在线阅读下载全文

作  者:王鹏超 Wang Pengchao(Dianping Colliery,Shanxi Coking Coal Huozhou Coal Power Group,Lvliang,Shanxi 033100)

机构地区:[1]山西焦煤霍州煤电店坪煤矿,山西吕梁033100

出  处:《江西煤炭科技》2024年第2期31-33,共3页Jiangxi Coal Science & Technology

摘  要:店坪煤矿2041巷在过巷段掘进期间,受地质条件复杂、巷道施工断面大、三角区围岩稳定性差等因素影响,导致施工难度大、效率低。针对过巷段巷道施工,经技术论证,决定采用近距离过巷施工技术和“人工复合顶板+柔模浇筑+工字钢棚”联合支护技术方案。实践表明,该方案避免了大断面风桥施工,缩短巷道施工周期达9d,有效控制了过巷段及三角区的顶板稳定性,应用取得了显著成效。In response to the difficulty and low efficiency of the construction of the 2041 roadway section in Dianping Colliery,after technical demonstration,it has been decided to adopt the close distance crossing roadway construction technology and the joint support technology scheme of"artificial composite roof,flexible module pouring and I-beam shed",whose practice shows that the scheme avoids the construction of large cross-section wind bridges,shortens the construction period of tunnels by 9 days,effectively controls the stability of the roof in the crossing roadway and triangular area,and has achieved significant results in application.

关 键 词:巷道掘进 过巷段 施工方案优化 联合支护 

分 类 号:TD263.42[矿业工程—矿井建设] TD353

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象