检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘小宇 Liu Xiaoyu(No.2 Colliery,Yangquan Coal Industry(group)Co.,Ltd.,Yangquan,Shanxi 045000)
机构地区:[1]山西华阳集团新能股份有限公司二矿,山西阳泉045000
出 处:《江西煤炭科技》2024年第2期135-138,141,共5页Jiangxi Coal Science & Technology
摘 要:因华阳二矿通风系统存在巷道阻力异常、需风量增大及增风困难等问题,提出四种通风系统优化方案:一是将立风井改作为回风井;二是将西风井改作为回风井;三是将东风井原主要通风机与现有风机并联运行;四是不增设风井,新设一条并联回风巷。经对比分析得到:采用方案二,该矿通风系统安全评价结果由原来的55.9分提高到74.9分,且均大于其他方案,通风系统提升为较安全状态。Aiming at the abnormal roadway resistance,increased air demand and difficult ventilation increasing in ventilation system in No.2 Colliery of Yangquan Coal Industry(group)Co.,Ltd.,the author proposes four ventilation system optimization schemeschanging the vertical shaft into return-air shaf,changing the western air shaft into return-air shaft,realizing parallel running of the original main ventilator in the eastern air shaft with the current,changing the western air shaft into return-air shaft,adding a parallel ventilation roadway with no air shaft,in which scheme 2 is applied by comparative analysis,promoting the ventilation system into safety status with increased scores of safety evaluation result from 55.9 to 74.9.
分 类 号:TD725[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222