检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张兆一 ZHANG Zhaoyi(State Key Laboratory of Coal Mine Disaster Prevention and Control,Chongqing 400037,China;CCTEG Chongqing Research Institute,Chongqing 400037,China)
机构地区:[1]煤矿灾害防控全国重点实验室,重庆400037 [2]中煤科工集团重庆研究院有限公司,重庆400037
出 处:《矿业安全与环保》2024年第2期111-117,126,共8页Mining Safety & Environmental Protection
基 金:天地科技股份有限公司科技创新创业资金专项项目(2022-2-TD-ZD008)。
摘 要:为研究近距离坚硬顶板巷道水力控顶理论,通过理论分析和数值模拟研究了水力化控顶卸压时煤层载荷、巷道应力分布规律,揭示了水力化控顶卸压对巷道围岩稳定性的影响机制,阐明了该技术的工艺流程。研究结果表明:81403回风巷道未开掘时,工作面周期来压步距19 m,直接顶厚度4.84 m,基本顶厚度10.64 m,内应力区范围5.2 m;远离81401采空区侧的15#煤层荷载与巷道开掘和单向切顶后相比分别降低了20%、15%;现场观测切顶钻孔试验区域巷道高度收敛率为33.7%、巷道宽度收敛率为23.0%,巷道高度收敛率较对比区域降低39%、宽度收敛率较对比区域降低32%。采用单侧高压磨料射流钻孔切顶能使顶板岩层及时垮落,切断顶板岩层间应力传递途径,能有效改善巷道围岩应力状态,减少工作面回采巷道后期顶底板及两帮变形量,降低巷道维护难度。In order to study the hydraulic roof control theory in contiguous hard roof roadway,the distribution of coal seam load and roadway stress during hydraulic roof control and pressure relief were investigated through theoretical analysis and numerical simulation.The mechanism of the influence of hydraulic roof control and pressure relief on the stability of roadway surrounding rock has been revealed,and the associated technological process has been elucidated.The results show that when the 81403 return airway is not excavated,the periodic weighting step of the working face is 19 m,the immediate roof thickness is 4.84 m,the main roof thickness is 10.64 m,and the range of internal stress zone is 5.2 m.Compared to the excavation of the roadway and the single roof cutting,the load of No.15 coal seam away from the side of 81401 goaf is reduced by 20%and 15%,respectively.The convergence rate of roadway height and width in the on-site observation of the top cutting drilling test area is 33.7%and 23.0%,respectively.The convergence rate of roadway height and width is 39%and 32%lower than those in the comparison area.The use of unilateral high-pressure abrasive jet drilling and roof cutting can timely collapse the roof rock layer,cut off the stress transmission path between the roof rock layers.Therefore,it can effectively improve the stress state of the surrounding rock of the roadway,reduce the deformation of the roof,floor,two sides of the roadway in the later stage of mining,and the difficulty of roadway maintenance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74