作 者:保涛 Bao Tao(Lanzhou Municipal Construction Group Co.,Ltd.,Lanzhou,China)
出 处:《科学技术创新》2024年第9期127-130,共4页Scientific and Technological Innovation
摘 要:某高速公路特大桥2^(#)主墩位于深水中,为进行承台施工,首先进行了围堰方案比选。选择锁扣钢管桩围堰方案后,再对锁扣钢管桩围堰进行专门设计,并建立模型对其进行验算,最终得以成功实施。该桥2^(#)主墩承台实施表明,该方案切实可行,成本节约35.84%,工期节约15.17%。The 2^(#)main pier of a super large bridge on a certain expressway is located in deep water.In order to carry out pier construction,a comparison of cofferdam schemes was first conducted.After selecting the lock buckle steel pipe pile cofferdam scheme,a specialized design was carried out for the lock buckle steel pipe pile cofferdam,and a model was established to verify it,ultimately achieving successful implementation.The implementation of the 2^(#)main pier cap of the bridge shows that the plan is practical and feasible,with a cost savings of 35.84%and a construction period savings of 15.17%.
分 类 号:U445.556[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171