检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段立英 马振宁 DUAN Liying;MA Zhenning(School of Municipal and Geomatics Engineering,Hunan City University,Yiyang 413000,China;School of Transportation Engineering,Changsha University of Science and Technology,Changsha 410000,China)
机构地区:[1]湖南城市学院市政与测绘工程学院,湖南益阳413000 [2]长沙理工大学交通运输工程学院,湖南长沙410000
出 处:《湖南文理学院学报(自然科学版)》2024年第2期71-77,共7页Journal of Hunan University of Arts and Science(Science and Technology)
摘 要:本文搭建了9种不同基质层的绿化屋面模块装置及人工模拟降雨装置,通过实验方法与模拟分析法研究株洲市绿化屋面对雨水产流时间、径流量及储蓄作用的影响。研究表明:绿化屋面相对于普通屋面均具有产流延迟作用和径流洪峰削减作用,产流最大延迟时间可达5.7倍,洪峰削减率可达38.7%。In this paper,nine kinds of green roofing modules and artificial simulated rainfall devices with different substrate layers were built.The influence of green roofing on the time,runoff and saving of rainwater in Zhuzhou City was studied by experiment and simulation analysis.The results show that compared with common roofs,the green roof has the effect of flow generation delay and flood peak reduction,with maximum delay time of flow generation up to 5.7 times and flood peak reduction rate up to 38.7%.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.90.123