检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵凯 Zhao Kai(Shanxi Gujiao Xishan Yicheng Coal Industry Co.,Ltd.,Shanxi Gujiao 030200)
机构地区:[1]山西古交西山义城煤业有限责任公司,山西古交030200
出 处:《山东煤炭科技》2024年第4期1-5,共5页Shandong Coal Science and Technology
摘 要:针对义城煤业煤仓堵仓,在煤仓设计时就考虑堵仓问题,通过将煤仓设计为2个放煤口和2个给煤机的方法,从煤仓内部分煤器将煤炭分别从2个放煤口放出,当其中一个放煤口堵塞,打开另一个给煤机进行放煤,可使堵塞的放煤口自然疏通,操作简单。矿井新煤仓施工完毕后使用效果良好,从源头上解决了单放煤口煤仓堵仓后需要放炮疏通的问题。Aiming at the bunker blockage in the coal bunker of Yicheng Coal Industry,the problem of bunker blockage is considered in the design of the coal bunker.By designing the coal bunker as two coal discharge ports and two coal feeders,coal is discharged from two coal discharge ports of coal separator inner the coal bunker separately.When one of the coal discharge ports is blocked,the other coal feeder is opened for coal discharge,which can naturally clear the blocked coal discharge port and the operation is simple,and the new coal bunker in the mine is well used after construction,solves the problem of bunker blockage in the coal bunker at the single coal discharge port from the source,which requires blasting to clear the blockage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.216.188