基于巴歇尔槽的输变电工程施工降水检测系统设计  

Design of Engineering Dewatering System for the Construction of Power Transmission and Transformation Projects Based on Bashal Trough

在线阅读下载全文

作  者:刘玉海 田鑫娜 姜雅男 LIU Yuhai;TIAN Xinna;JIANG Yanan(Construction Company of State Grid Shandong Electric Pwer Co.,Ltd.,Jinan 250001)

机构地区:[1]国网山东省电力公司建设公司,山东济南250001

出  处:《电力安全技术》2024年第4期40-43,共4页Electric Safety Technology

基  金:国网山东省电力公司建设公司群众创新项目资助(SGSDJS00EBJS2310060)。

摘  要:为解决输变电工程施工降水费用结算误差较大的问题,研制了一套基于巴歇尔槽的输变电工程施工降水的检测与分析系统。该系统可检测水泵的排水量与排水时长,分析检测数据,并统计排水总量,准确计算水泵的降水台班,合理控制降水费用,并广泛应用于不同工程中。In response to the problem of significant settlement errors in the engineering dewatering costs of power transmission and transformation projects,a engineering dewatering detection and analysis system for power transmission and transformation projects based on Bashal trough is proposed.The system enables to detect the drainage and drainage time of water pumps,analyze the detection data with a statistics of total drainage,exactly calculate the dewatering shifts per water pump,reasonably control the cost of dewatering,and is available for a variety of projects.

关 键 词:输变电工程 施工降水 流量检测 降水费用 巴歇尔槽 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象