检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡梓锡 耿笑冬 霍晓娣 刘双 HU Zixi;GENG Xiaodong;HUO Xiaodi;LIU Shuang(State Grid Shijiazhuang Power Supply Company,Shijiazhuang 050000,China;State Grid Luancheng District Power Supply Company,Shijiazhuang 050000,China)
机构地区:[1]国网石家庄供电公司,石家庄050000 [2]国网栾城区供电公司,石家庄050000
出 处:《人工智能科学与工程》2024年第1期85-92,共8页Journal of Southwest China Normal University(Natural Science Edition)
摘 要:为实现电力系统应急故障的高效抢修,降低故障风险,提出基于差分进化算法和交叉算子的电力企业应急物资多目标分层调度方法。该方法结合电力企业全局调度需求,确定电力企业应急物资多目标上层调度目标函数和下层调度目标函数,同时设计对应的约束条件;采用差分进化算法求解双层调度目标函数,并且为保证解的多样性和算法收敛性,引入进化过程信息优化算法变异算子的变异概率,以此保证目标函数的求解效果。测试结果显示:反世代距离和散布性分别在0.034和0.28以下;结合应急物资供应点位置进行应急物资调配路径规划;应急物资调度的公平性、资源覆盖满意度均在0.92以上;调度后,电力系统的风险固结函数结果均在0.14以下。In order to achieve efficient emergency repair of power system faults and reduce fault risks,a multi-objective hierarchical scheduling method for emergency supplies in power enterprises based on differential evolution algorithm and crossover operator is proposed.This method combined the global scheduling needs of power enterprises to determine the multi-objective upper-level and lower-level scheduling objective functions for emergency supplies in power enterprises,while designing corresponding constraint conditions.We used differential evolution algorithm to solve the dual layer scheduling objective function.To ensure the diversity of solutions and algorithm convergence,we introduced evolutionary process information optimization algorithm to optimize the mutation probability of the mutation operator,thereby ensuring the effectiveness of solving the objective function.The test results show that the reverse generation distance and dispersion were below 0.034 and 0.28,respectively.Plan emergency material allocation paths based on the location of emergency material supply points and the fairness of emergency material dispatch and satisfaction with resource coverage were both above 0.92.After scheduling,the risk consolidation function results of the power system were all below 0.14.
关 键 词:差分进化算法 交叉算子 电力企业 应急物资 多目标 分层调度
分 类 号:TP18[自动化与计算机技术—控制理论与控制工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38