检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑旭红
机构地区:[1]斯普屹科技(北京)有限公司,北京100195
出 处:《科技创新与应用》2024年第14期168-171,共4页Technology Innovation and Application
摘 要:电力工程和建设项目有着很大的区别,为了保证输电线路的正常运转,必须对输变电工程线路施工技术进行讨论和研究,并对技术的保障措施进行归纳,保证建设的高效进行。与此同时,在企业的经营方式上,建立健全管理机制、检查制度,加大技术研发的投入,以此来提高企业的日常运营和维修工作的效率和技术水平。因此,该文着重对220 kV输电线路的建设中应注意的问题进行探讨。There is a great difference between electric power engineering and construction projects.in order to ensure the normal operation of transmission lines,the construction technology of power transmission and transformation projects must be discussed and studied,and the technical safeguard measures must be summarized to ensure the efficient construction.At the same time,in the mode of operation of the enterprise,establish and improve the management mechanism,inspection system,increase investment in technology research and development,so as to improve the efficiency and technical level of the daily operation and maintenance work of the enterprise.Therefore,this paper focuses on the problems that should be paid attention to in the construction of 220 kV transmission lines.
关 键 词:220 kV输变电工程 施工技术 管理机制 检查制度 线路施工
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.84