检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘建涛 王蕾[1] 邓晓帆 焦提操 LIU Jiantao;WANG Lei;DENG Xiaofan;JIAO Ticao(School of Electrical and Electronic Engineering,Shandong University of Technology,Zibo 255000,China;Jiaxiang Power Supply Company of State Grid Shandong Electric Power Company,Jining 272400,China)
机构地区:[1]山东理工大学电气与电子工程学院,山东淄博255000 [2]国网山东省电力公司嘉祥县供电公司,山东济宁272400
出 处:《电力自动化设备》2024年第5期217-224,共8页Electric Power Automation Equipment
基 金:国家自然科学基金资助项目(52377109,62073200);山东省自然科学基金资助项目(ZR2022ME187);山东省泰山学者项目(TSQN202306191)
摘 要:为提升电力系统的电压稳定性,提出一种基于输电线路切换的电压稳定性增强控制模型,该模型以最少的切换输电线路数量为目标来满足电力系统负荷裕度的提升需求。为灵活构建线路切换数学模型,提出基于支路追加法将线路切换融入原问题模型中。为降低模型求解难度,提出一种阶段式求解策略:基于负荷裕度对线路参数的灵敏度快速预筛选出可以提高系统负荷裕度的候选切换集,降低0-1整数变量的搜索范围;基于外逼近和松弛策略将原问题分解为2个子问题进行迭代求解,进一步提高模型的求解速度和精度。IEEE118节点和IEEE662节点系统仿真结果验证了所提模型与方法的有效性。In order to improve the voltage stability of power system,an enhancement control model of voltage stability based on transmission line switching is proposed,which takes the minimum switching number of transmission lines as the objective to meet the requirement of load margin improvement of power system.In order to flexibly construct the mathematic model of line switching,it is proposed to incorporate the line switching into the model of the original problem based on the branch addition method.In order to reduce the solution difficulty of the model,a stage solution strategy is proposed.The candidate switching set that can improve the system load margin is fast pre-screened based on the sensitivity of load margin on the line parameters,and the searching scope of 0-1 integer variables is reduced.The original problem is decom⁃posed into two subproblems for iterative solution based on the external approximation and relaxation strategy,which further improves the speed and accuracy of model solution.The effectiveness of the proposed model and method is verified by the IEEE 118-bus and 662-bus power systems.
关 键 词:输电线路切换 电压稳定性 最少切换数量 支路追加法 阶段式求解策略
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.133.22