检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐俊祥[1] 王艳强 李旭[1] 罗滔 XU Junxiang;WANG Yanqiang;LI Xu;LUO Tao(Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Jinan,Shandong 250014,China;Shaanxi Key Laboratory of Safety and Durability of Concrete Structures,Xijing University,Xi′an,Shaanxi 710123,China;College of Water Resources and Architectural Engineering,Northwest A&F University,Yangling,Shaanxi 712100,China)
机构地区:[1]山东电力工程咨询院有限公司,山东济南250014 [2]西京学院陕西省混凝土结构安全与耐久性重点实验室,陕西西安710123 [3]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水利与建筑工程学报》2024年第2期26-31,共6页Journal of Water Resources and Architectural Engineering
基 金:陕西省青年科技新星项目(2022KJXX-85);山东电力工程咨询院有限公司科技研发项目(37-K2022-037)。
摘 要:为了了解抽水蓄能电站地下厂房洞室群开挖支护后围岩的稳定性,以某抽水蓄能电站地下厂房洞室群为例,采用隐式弹粘塑性本构关系,建立三维有限元模型,对比分析地下洞室群毛洞工况、锚杆+锚索+衬砌联合支护工况及支护参数优化后围岩的变形、应力场分布及D-P点安全系数。结果表明:采用锚杆+锚索+衬砌联合支护的方式可以有效减小地下洞室群围岩的位移量,提高D-P点安全系数,使应力分布更为均匀,围岩的稳定性更好。锚杆长度在6m~8m范围变化及锚索预应力变化对围岩的变形、应力以及D-P点安全系数的影响不显著,但是对围岩局部有一定的影响,施工过程中应动态优化调整。In order to understand the stability of surrounding rock after excavation and support of underground powerhouse cavern group in pumped storage power stations,a certain underground carvern group of pumped storage power station was taken as an example.Threedimensional finite element model was established by using the implicit elastoplastic constitutive relationship.The deformation,stress field distribution,and the safety factor of the surrounding rock under different conditions were analyzed.The initial excavation condition,the condition with combined support of rock bolts,anchor cables and lining were compared.And the condition of optimizing support parameters was also analyzed.The results indicate that the combined support of rock bolts,anchor cables and lining could reduce the displacement of the surrounding rock in the underground cavern group,increase the D-P point safety factor,and create a more uniform stress distribution.Which improved the stability of the surrounding rock.The variation in the length of rock bolts within the range of 6 to 8 meters and the change in anchor cable prestressing have negligible impacts on the deformation,stress,and D-P point safety factor of the surrounding rock.But they do have some influence on local areas of the surrounding rock,thus dynamic optimization adjustment should be made during construction.
关 键 词:地下洞室 分层开挖 锚喷支护 三维有限元 D-P点安全系数