提高临哈铁路货运能力对策研究  被引量:1

Countermeasures to Improve Freight Capacity of Linhe-Hami Railway Line

在线阅读下载全文

作  者:赵广富 ZHAO Guangfu(Dispatching Office,China Railway Hohhot Group Co.,Ltd.,Hohhot 010010,Inner Mongolia,China)

机构地区:[1]中国铁路呼和浩特局集团有限公司调度所,内蒙古呼和浩特010010

出  处:《铁道货运》2024年第5期1-5,11,共6页Railway Freight Transport

基  金:中国国家铁路集团有限公司科技研究开发计划课题(Q113623S04005)。

摘  要:临哈铁路作为疆煤外运的北翼通道,提高其货运能力,为国家能源安全稳定供应提供运力支撑,对进一步服务国家能源保供大局具有十分重要的意义。在阐述临哈铁路基本情况及货运需求能力分析的基础上,针对临哈铁路运输组织过程中存在的单线区段限制能力提升、大区间列车运行调整困难、点线能力不协调不匹配、衔接线路通道能力紧张、分界口利用率不高、机车运用紧张、机班投入不足等问题分析原因,有针对性地提出新增二线及电化工程改造、开通部分车站侧线、修建车站增加会车能力、优化临河节点运输组织、加强外排车流输送、组织均衡运输及优化机车机班运用等建议,以期达到提高临哈铁路货运能力的目的。Linhe-Hami Railway Line is a northern channel for Xinjiang coal transportation.Improvement of Linhe-Hami Railway Line freight capacity is of great significance as it will better underpin safe and stable national energy supply transportation.Based on current situation and freight demand of Linhe-Hami Railway Line,multiple factors in transportation organization impacting the improvement of freight capacity were analyzed,including single line section capacity improvement,train operation adjustment in large sections,uncoordinated and mismatched capabilities between nodes and lines,connection of line channels,low utilization rate of boundary points,tight locomotive operation,and insufficient input of locomotive crew.Suggestions to improve the freight capacity of Linhe-Hami Railway Line were proposed to meet its freight demand including addition of an alternative line,electrification renovations,opening of some station sidings,construction of new stations to increase passing capacity,optimization of transportation organization at Linhe node,stepping up discharge,balance of transportation,and optimizing locomotive operation and crew arrangement.

关 键 词:临哈铁路 疆煤外运 货运增量 运输调整 货运能力 

分 类 号:U294.1[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象