检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王俊俊 WANG Jun-jun(China Railway 17th Bureau Group Co.,Ltd.Fourth Company,Chongqing 401120,China)
机构地区:[1]中铁十七局集团有限公司第四工程有限公司,重庆401120
出 处:《价值工程》2024年第13期50-55,共6页Value Engineering
摘 要:结合成达万高铁遂宁涪江特大桥斜拉桥边跨现浇梁施工,从梁柱式支架的设计及施工入手,对大跨度斜拉桥边跨连续箱梁施工质量控制进行重点阐述,并对其关键节点进行分析,旨在不断完善和发展大跨度梁柱式支架施工技术,充分保证梁体施工质量,为今后类似的工程提供重要借鉴意义。Based on the construction of cast-in-place beams for the side span of the Suining Fujiang Extra Large Bridge of the Chengda Wan high-speed railway,this paper focuses on the design and construction of beam column supports,and elaborates on the quality control of continuous box girder construction for the side span of the large-span cable-stayed bridge.The key nodes are analyzed,aiming to continuously improve and develop the construction technology of large-span beam column supports,fully ensure the quality of beam construction,and provide important reference significance for similar projects in the future.
关 键 词:斜拉桥 大跨度 水中梁柱式支架 现浇梁 质量控制
分 类 号:U445.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49